Selected work by our team: six projects, the problem each client faced, how we approached it and the results achieved. Client names are withheld for confidentiality.
Our team brings PhD-level research, PMI Portfolio Management Professional (PfMP) certification and Lean Six Sigma Black Belt expertise to every engagement.
Service management automation: daily processing time cut by 87%
Challenge
Staff copied service management tickets by hand from an internal system into the client’s system every day, about two hours of repetitive work with a constant risk of entry errors. Direct integration was not possible because of authorization constraints.
Approach
We formalized the process end to end, including every rule, dependency and exception, then built a robotic process automation (RPA) prototype that moves the ticket data between the two systems without human intervention.
| Metric | Before | After |
|---|---|---|
| Daily processing time | 2 hours | 15 minutes (−87%) |
| Manual intervention | Every day | None |
| Manual entry errors | Present | Eliminated |
| Payback period | — | 4.5 months |
“What used to take two hours of repetitive manual work every day now runs automatically in minutes, with no human intervention and no manual errors.”
— Service Operations Manager
Quality control system: cost of non-conformance cut by 70%
Challenge
Quality checks relied on paper checklists, manual data entry and ad hoc calculations. Measurement errors were frequent, out-of-range readings were caught late, and scrap, rework and penalties were expensive.
Approach
We designed and built custom quality control software that applies the client’s own statistical sampling methods, alerts users the moment a measurement falls outside control limits, and triggers structured corrective-action reports. It helps teams tell one-off human errors apart from real process problems.
| Metric | Before | After |
|---|---|---|
| Cost of non-conformance | High | −70% |
| Defect detection | Slow | Immediate alerts |
| Human measurement errors | Frequent | Rare |
| Corrective actions | Delayed | Triggered automatically |
“The system gave us instant visibility into quality issues. We stopped defects before they became costly scrap, and our non-conformance costs dropped dramatically within weeks.”
— Quality Director
Workshop layout redesign: 65% fewer person-hours, 40% better machine reliability
Challenge
The shop floor had grown over time without a plan. Materials travelled long distances between stations, machines broke down often, electricity costs were high and workers were fatigued. Earlier fixes had moved single machines without looking at the whole flow.
Approach
We led a cross-functional team through process analysis, process modeling of alternative layouts, simulation of material movement, energy use and equipment wear, and co-creation workshops with floor managers. The new layout leaves room to grow and was rolled out with minimal disruption and no major capital investment.
| Metric | Before | After |
|---|---|---|
| Person-hours required | Baseline | −65% |
| Mean time between machine failures | Baseline | +40% |
| Material movement time | High | Significantly reduced |
| Electricity consumption | High | Lower |
“The new layout transformed our workshop: workers spend far less time moving materials, machines run more reliably, and our energy bill dropped noticeably within three months.”
— Plant Manager
Custom warehouse management system: inventory losses cut by more than 50%
Challenge
The company was losing value every month through imprecise dosing of raw materials, undetected theft of high-value inputs and manual tracking that gave no real-time view of stock.
Approach
We built an in-house warehouse management system around three roles: warehouse managers (stocking and logistics), store managers (usage at the point of consumption) and owners (real-time stock levels, statistics and automated reports). Dashboards, alerts for low stock or unusual usage, role-based access and audit trails complete it.
| Metric | Before | After |
|---|---|---|
| Inventory losses | High | −50% or more |
| Dosage errors | Frequent | Rare |
| Theft | Undetected | Detected and stopped |
| Inventory reporting | Days or weeks late | Real time |
“Within three months of launching the system, our material losses dropped by more than half. We finally have real-time visibility and can spot issues before they become costly.”
— Operations Owner
External PMO for four companies: process automation aligned with strategy
Challenge
Four small and medium-sized companies ran key processes in informal, inconsistent or heavily manual ways, each with different strategic priorities. Automating those processes as they were would only have digitized the inefficiency.
Approach
Acting as external Head of PMO for all four, we formalized each workflow, standardized it, optimized it and only then selected the right automation technology for each process. Portfolio governance kept every initiative aligned with strategy, budget and delivery commitments.
| Metric | Before | After |
|---|---|---|
| Portfolio governance | Ad hoc initiatives | Structured PMO oversight, 4 clients in parallel |
| Process definition | Informal | Formally documented |
| Process execution | Variable and manual | Standardized and optimized |
| Technology choices | Tactical | Driven by process need |
“The value was not just in automating tasks, but in bringing order, structure, and strategic direction to each operational environment before choosing the right technology response.”
— CEO
Portfolio of six technology projects: revenue 15% above target
Challenge
Six technology projects had to be delivered at the same time, while projects already completed still needed maintenance and support, all against revenue targets over two consecutive semesters.
Approach
We prioritized the portfolio by revenue goals, delivery capacity and client needs, governed execution through milestones, dependencies and risks, and moved each completed project into ongoing maintenance so customers stayed supported after go-live.
| Metric | Before | After |
|---|---|---|
| Revenue | Target | +15% above target |
| Major milestones | At risk | 100% achieved |
| Delivery consistency | Variable | Two consecutive semesters |
| Customer support | Project-based only | Ongoing maintenance |